We would like to make our parents aware of a transport survey due to be conducted by Nationwide Data Collection on 11th September 2019 on Dalesway. The survey will be a 12-hour two-way traffic survey and is being carried out as part of the Department for Transport’s annual link count program. There are a number of major and minor road sites scheduled for survey between March and the end of October. The vast majority of these surveys are intended to be carried out by enumerators parked at the roadside.